Newly you can take cost report easily which year you want by change unit price year. (Valid for 2014 and following years.)
In order to ensure consistency between the general cost report and the individual cost report on the basis of the transformer; a. Studies performed in general cost report under editing cost report menu. If you want edit cost report from manualy, you must do editing in "Transformer Based Cost Report" under Editing Cost Report menu. b.Column showing which transformer belongs to any material in "General Cost Report" under "Editing Cost Report" menu. c.Montage and transporting cost areas automaticly calculated uptade was provided when you add manualy pole or cross-arm, change material quantity in "Transformer Based Cost Report" under Editing Cost Report menu.
The summary part of the cost reports was provided to automatically print information about the installation area and year.
In the transformer based cost report; On the last page overview was created.
Galvanised MAB and PVC MAB boxes are added to b-PRO EDS.
Different types of meter boards were provided for the poles. To do this, add the meter board to the direct menu.
In the previous version, if the transformer is disassembled and renewed; The LV board was being renewed with the transformer.The LV board remained in place and the cost report was made manually.This topic has been revised. In order for the LV board to remain in the "Materials" tab of the Transformer menu; "Existing LV Board Remain" option has been brought.Thanks to this feature, the LV board has become independent of the transformer.
By re-arranging ANNEX-3 form, the program was provided to give ANNEX-3 in the format requested by EPDK.
About the cost report of Galvanized Polygon lighting poles; in the previous version, the material price came from the piece, the montage price was kg. At this time added name called "Galv. Pol. Lght. poles costs to be determinated from kg" in system options. If this options was marked, lightning pole materials came from the kg in 005.5.3.3.MMM product code number, materials montages came from the kg in 005.5.3.2.MMM product code number. If this option not marked, material prices came from pieces, material montage prices came from kg in 005.5.3.2.MMM product code number.
In the parts of the building type transformers which are connected to the overhead line and/or pass from the underground to the overhead line; The poles were automatically supplied with surge arrester and other necessary materials. (In order for the surge arrester and the grounding to be made, the necessary adjustments should be made in the “Exceptions” tab of the "MV Single Line Diagram Default Values" menu and then a MV single line diagram should be created. Then the program will automatically bring the surge arrester and materials to drawings and cost report.)
Any project drawn in the new version of the b-PRO EDS program has been rendered alert to the version difference when attempting to open the old version.(It will apply to versions later than version 3.58.1.2.)
In the building layout plans, the symbol of the transformer has been updated.
Cable Trench made in piping, used for cables "Cable Casing Pipes", it was allowed to come to the cost report according to the characteristics of the investment.
When enumerating the lighting poles, the numbering feature was updated according to the R-S-T phases. To use this feature; "Use R-S-T in Lightning Pole Numbers" in "System Options" must be active.
With respect to Cable Trenches; a.m3/TL prices to obtain by made of analysis for all cable trenches b.In previous version, all processing about cable trenches (detecting cable trench type, prices, product code number etc.) made by cable trench table. In new version, only cable trench variations maded by cable trench table. Prices came from price table and product key numbers came from material table. c.It was ensured that the cable trenches that were priced with m3 came to the end of their product code number. d.Machine excavation and manual excavation poses, the descriptions were separated from each other. e.In the case of not drawing any cable trench in the project and in case of new underground cables in the project; for the purpose of cost reports will be right, brings about a cable trench product code number.It is also possible to write the special expression ending of these product code numbers too.
About of drawing cable trench, added cable trench button in menu. Using for drawing cable trench "8" button, connected this button.
Its also possible all top of sheets to report, reduce to writting project name and project status.
In the case of changing the types of poles with detailed query, the types of poles change in the calculates but the old type names still remain on the screen. A similar situation was observed in changing the status of the lamps. These conditions are fixed.
In the new pole list, the current lighting poles were written in the spotlight and the new lighting pole. This has been fixed.
The box list says "LV DISTRIBUTION BOX LIST" on top of each transformer field. This list name was provided only on the first page.
Transformer and pole menu form has been arranged and made easier to understand and useful.
In pole selecting options, when wants to selecting new poles made by tree and inefficient tree poles replacement concrete/iron pole, in the pole restrictions concrete/iron option doesn't works. Fixed.
Concrete kiosk; in the absence of transformer (when transformer power selecting zero), automaticly selecting voltage transformer switchgear and battery-rectifier group skill has been acquired.
Purpose of concrete kiosk and substations earthing; need to earthing for earthing rod, 50mm2 NYY cable and 95mm2 steel conductor needed to quanity, automaticly came to cost report.
Part-based costing report of concrete kiosks from system options; fixed errors in pole type transformers disassembly product code numbers.
In previously version, concrete kiosk's cost report making up in a single piece; 1x95mm2 cable, cable head for this cable and 1m3 cable trench coming to cost report. These product code numbers were prevented from coming because of the price of the concrete kiosk.
The number of external cable headers in the transformers transformed from underground to overhead transformers was ensured.
Due to the fact that the aluminum cable heads are not in the unit price book, the end of their product code numbers have been expressed as PRIVATE.
Potencies and cross-arms automaticly selected by program was revised for galvanised iron poles. (ex. gt-60, gt-70...) This situation revised; Made easier to understand elected to cross-arms and potencies like g6, 5U-60, gD-200...
For the newly added concrete and tree poles in project, transporting product code number was revised for the transport prices will be right.
Galvanised conical polygon (DAD) type lightning poles was added database.
Selecting options setting by users in "Pole Selection Options" menu, saved for this project to continuously.
As known, 1x35 earthing conductor uses in lightning poles and box earthing. In proviously years, material priced by 9.1 product code number and montage price, priced by 30.2.3 product code number by kg for dont have 1x35 conductor price. According to 2015 Tedas unit price book; in 30.2.4 product code number,1x35 earthing conductors unite price, added to unit price book by meter. This situation revised in program.
According to 2015 unit price book material and montage prices revised for aluminum cables.
In the b-PRO EDŞ program, new, removed, etc. ETL conductors entered from the obligation were brought to the cost report.
"Temporary Commands" under "General" menu tab was removed.
Lattice utility pole symbol was added in automaticly drawing title block template symbols.
In LV single line diagram drawings, some subtition or pole type transformers types symbols comes wrong to blocked.
For plotting to automaticly "Substation Unit Lan Acquisition Planning"; point-comma error after command fixed.
When creating LV single line diagram; if in project, over 2500kVA a transformer, program gives eror code. This situation revised.
In previously version, creating project after giving command "Transformation Overhead Line to Lightning Project" under "Auto Modules" menu, LV short circuit calculation not made. This situation fixed.
Fixed a number of errors during the "Add Project" command that was used when two different projects were requested to be merged.
In the previous version, the LV voltage drop calculation gave an error during the when the pole typed transformer was directly connected to a terminal box. Fixed.
In the same project; When the cost report was created several times to never closed, the error "insufficient memory" was fixed.